Abstract:Liaoning ShiHua University has built “petrochemical industry chain physical simulation practice education base” for students to carry out cognitive and operational practice, combining theory and practice to improve students’ practical ability. But some of the equipment installation and commissioning has not yet been completed, some devices can be improved. In the case of oil storage and storage facilities, the completion of the onsite inspection instrument and the monitoring system is not finished and the monitoring points are few. This topic is aimed at the engineering training center of our school oil storage system and combined with the configuration technology;The system designed based on the power control configuration software and Siemens S7200 PLC as the control core.